Dig begins on Seattle waterfront pit for huge tunnel machine – Puget Sound Business Journal

Workers near Seattle’s waterfront this week began building the underground lair for the giant tunnel machine that will chew a new path under the city.

Like a subterranean beast, the tunnel machine will creep along at 3 inches a minute, digesting the compacted silt and gravel that underlie Seattle.

The start of drilling the pit that will house the tunnel machine marks a major milestone in the epic effort to replace the Alaskan Way Viaduct with a tunnel — a project that still generates doubts over whether it will collect enough tolls and move enough traffic through an hourglass-shaped city.

The viaduct replacement dig will follow the closely watched tunnel projects serving Sound Transit    and the Brightwater sewage treatment plant. Those projects have encountered obstacles that included a 2007 worker death during the drilling of Sound Transit’s Beacon Hill tunnel and the 2009 breakdown of a Brightwater tunneling machine.

FOR THE FULL ARTICLE, CLICK BELOW:

via Dig begins on Seattle waterfront pit for huge tunnel machine – Puget Sound Business Journal.

Advertisements
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s